Show on map
Greenville 230 kV line — Transmission lineGreenville Farm 2 — Postponed · Solar · NC · 3 MW · 3.6 mi awayMason Solar Center LLC — Postponed · Solar · NC · 15.3 MW · 4.9 mi awayChoco Solar, LLC — Postponed · Solar · NC · 5 MW · 10.2 mi awayGrifton PV2 — Postponed · Solar · NC · 56 MW · 11.0 mi away
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Greenville 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NC

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
11
Substations at the ends (as the source names them)
Greenville
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID171683
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Greenville Farm 2 Postponed Solar 3.6 mi 3
Mason Solar Center LLC Postponed Solar 4.9 mi 15.3
Choco Solar, LLC Postponed Solar 10.2 mi 5
Grifton PV2 Postponed Solar 11.0 mi 56

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution