Show on map
Greys Ferry - Passyunk 230 kV — Transmission lineEQUINIX — Large load · PA · 1.8 mi awayCROSS CONNECT SOLUTIONS — Built · Large load · PA · 1.8 mi away365 DATA CENTERS — Built · Large load · PA · 1.9 mi awayH5 DATA CENTERS — Built · Large load · PA · 1.9 mi awayDeptford Solar One — Postponed · Solar · NJ · 3 MW · 8.7 mi awayINNOVATION 2201 LLC / UPPER MERION TWP — Built · Large load · PA · 12.6 mi away
  • Loads
  • Operating
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Greys Ferry - Passyunk 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-PA
Owner (as stated)
PECO Energy

Details

Who’s behind it

Owner
PECO Energy

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
2
Substations at the ends (as the source names them)
Greys Ferry to Passyunk
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpeco energy
HIFLD line ID142119
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
EQUINIX Unknown Large load 1.8 mi
CROSS CONNECT SOLUTIONS Built Large load 1.8 mi
365 DATA CENTERS Built Large load 1.9 mi
H5 DATA CENTERS Built Large load 1.9 mi
Deptford Solar One Postponed Solar 8.7 mi 3
INNOVATION 2201 LLC / UPPER MERION TWP Built Large load 12.6 mi

Sources EPA ICIS-Air · EIA-860M

Sources

Attribution