Show on map
Griffin - Kathleen 230 kV — Transmission lineC D McIntosh Jr — Postponed · Oil · FL · 304 MW · 7.1 mi awayLKL Kingfisher, LLC — Postponed · Solar · FL · 6 MW · 9.0 mi awayPASCO COUNTY DATA CENTER — Built · Large load · FL · 12.2 mi awayPace Road Battery Storage — Permitted · Storage · FL · 20 MW · 12.8 mi awayMattaniah Solar — Under construction · Solar · FL · 52 MW · 13.1 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Griffin - Kathleen 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-FL
Owner (as stated)
Duke Energy Florida

Details

Who’s behind it

Owner
Duke Energy Florida

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
11
Substations at the ends (as the source names them)
Griffin to Kathleen
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy florida
HIFLD line ID134285
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
C D McIntosh Jr Postponed Oil 7.1 mi 304
LKL Kingfisher, LLC Postponed Solar 9.0 mi 6
PASCO COUNTY DATA CENTER Built Large load 12.2 mi
Pace Road Battery Storage Permitted Storage 12.8 mi 20
Mattaniah Solar Under construction Solar 13.1 mi 52

Sources EIA-860M · EPA ICIS-NPDES

Sources

Attribution