H 4 — Power plant · Hydro · Guadalupe Blanco River AuthorityCF BESS NINE — Storage · TX · 9.9 MW · 17.7 km away
  • Clean firm
  • Storage
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Hydro

Key facts

Power plant · Hydro Out of service
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1931
Net generation, 2025
0 MWh
Grid
12 kV to Guadalupe Valley Elec Coop Inc (ERCO)
Location
Gonzales County, Texas
Operated by
Guadalupe Blanco River AuthoritySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
95 years since 1931
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
12
Transmission owner
Guadalupe Valley Elec Coop Inc
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Eia status
By code
OS
Mw
2.40
Units
1
Standby mw
0
Status rule
majority_mw_out_of_service
In service mw
2.40
Out of service mw
2.40
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
CF BESS NINE Filed Storage 17.7 km 9.9

Sources EIA-860M

Sources

Attribution