H B Robinson 230 kV line: route and 17 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
H B Robinson 230 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-SC
- Owner (as stated)
- Duke Energy Progress
Details
Who’s behind it
- Owner
- Duke Energy Progress
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 29
- Substations at the ends (as the source names them)
- H B Robinson
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | duke energy progress |
| HIFLD line ID | 104921 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Juniper Solar Permitted | Solar | 0.1 mi | 74.9 |
| Culpepper Solar Permitted | Solar | 0.2 mi | 74.9 |
| Lotus Solar Permitted | Solar | 1.0 mi | 75 |
| Fairfield Solar Postponed | Solar | 1.3 mi | 10 |
| Dadswell Solar Postponed | Solar | 1.5 mi | 1 |
| Fishwater Solar Postponed | Solar | 1.7 mi | 2 |
| B & K Solar Under construction | Solar | 1.8 mi | 74.9 |
| Robinson Solar Plant Filed | Solar | 2.2 mi | 76 |
| GEB Solar Permitted | Solar | 3.1 mi | 50 |
| Ross Solar Permitted | Solar | 3.3 mi | 74.9 |
| Middleton Solar Postponed | Solar | 5.9 mi | 2 |
| Madison Solar Postponed | Solar | 6.0 mi | 10.9 |
| Rollins Solar Permitted | Solar | 7.2 mi | 74.9 |
| Shorthorn Solar Permitted | Solar | 10.5 mi | 60 |
| Scarlet Solar Postponed | Solar | 13.7 mi | 2 |
| Bell Solar Postponed | Solar | 14.1 mi | 6.1 |
| AMAZON DATA SERVICES, INC. - ENERGY WAY TECH CAMPUS Built | Large load | 14.8 mi |
Sources EIA-860M · EPA ICIS-Air