H B Robinson 230 kV line — Transmission lineCulpepper Solar — Permitted · Solar · SC · 74.9 MW · 0.2 mi awayRoss Solar — Permitted · Solar · SC · 74.9 MW · 0.5 mi awayLotus Solar — Permitted · Solar · SC · 75 MW · 1.0 mi awayFairfield Solar — Postponed · Solar · SC · 10 MW · 1.3 mi awayDadswell Solar — Postponed · Solar · SC · 1 MW · 1.5 mi awayFishwater Solar — Postponed · Solar · SC · 2 MW · 1.7 mi awayB & K Solar — Under construction · Solar · SC · 74.9 MW · 1.8 mi awayRobinson Solar Plant — Filed · Solar · SC · 76 MW · 2.2 mi awayGEB Solar — Permitted · Solar · SC · 50 MW · 3.1 mi awayMiddleton Solar — Postponed · Solar · SC · 2 MW · 5.9 mi awayMadison Solar — Postponed · Solar · SC · 10.9 MW · 6.0 mi awayRollins Solar — Permitted · Solar · SC · 74.9 MW · 7.2 mi awayShorthorn Solar — Permitted · Solar · SC · 60 MW · 10.4 mi awayJuniper Solar — Permitted · Solar · SC · 74.9 MW · 10.6 mi awayScarlet Solar — Postponed · Solar · SC · 2 MW · 11.9 mi awayBell Solar — Postponed · Solar · SC · 6.1 MW · 12.3 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

H B Robinson 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-SC
Owner (as stated)
Duke Energy Progress

Details

Who’s behind it

Owner
Duke Energy Progress

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
21
Substations at the ends (as the source names them)
H B Robinson
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy progress
HIFLD line ID110082
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Culpepper Solar Permitted Solar 0.2 mi 74.9
Ross Solar Permitted Solar 0.5 mi 74.9
Lotus Solar Permitted Solar 1.0 mi 75
Fairfield Solar Postponed Solar 1.3 mi 10
Dadswell Solar Postponed Solar 1.5 mi 1
Fishwater Solar Postponed Solar 1.7 mi 2
B & K Solar Under construction Solar 1.8 mi 74.9
Robinson Solar Plant Filed Solar 2.2 mi 76
GEB Solar Permitted Solar 3.1 mi 50
Middleton Solar Postponed Solar 5.9 mi 2
Madison Solar Postponed Solar 6.0 mi 10.9
Rollins Solar Permitted Solar 7.2 mi 74.9
Shorthorn Solar Permitted Solar 10.4 mi 60
Juniper Solar Permitted Solar 10.6 mi 74.9
Scarlet Solar Postponed Solar 11.9 mi 2
Bell Solar Postponed Solar 12.3 mi 6.1

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution