H B Robinson 230 kV line — Transmission lineDadswell Solar — Postponed · Solar · SC · 1 MW · 0.6 mi awayFairfield Solar — Postponed · Solar · SC · 10 MW · 1.3 mi awayFishwater Solar — Postponed · Solar · SC · 2 MW · 1.7 mi awayRobinson Solar Plant — Filed · Solar · SC · 76 MW · 2.2 mi awayLotus Solar — Permitted · Solar · SC · 75 MW · 4.4 mi awayMadison Solar — Postponed · Solar · SC · 10.9 MW · 5.0 mi awayMiddleton Solar — Postponed · Solar · SC · 2 MW · 5.0 mi awayB & K Solar — Under construction · Solar · SC · 74.9 MW · 5.5 mi awayGEB Solar — Permitted · Solar · SC · 50 MW · 6.3 mi awayRollins Solar — Permitted · Solar · SC · 74.9 MW · 7.7 mi awayShorthorn Solar — Permitted · Solar · SC · 60 MW · 9.3 mi awayCulpepper Solar — Permitted · Solar · SC · 74.9 MW · 12.0 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

H B Robinson 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-SC
Owner (as stated)
Duke Energy Progress

Details

Who’s behind it

Owner
Duke Energy Progress

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
2
Substations at the ends (as the source names them)
H B Robinson
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy progress
HIFLD line ID147861
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Dadswell Solar Postponed Solar 0.6 mi 1
Fairfield Solar Postponed Solar 1.3 mi 10
Fishwater Solar Postponed Solar 1.7 mi 2
Robinson Solar Plant Filed Solar 2.2 mi 76
Lotus Solar Permitted Solar 4.4 mi 75
Madison Solar Postponed Solar 5.0 mi 10.9
Middleton Solar Postponed Solar 5.0 mi 2
B & K Solar Under construction Solar 5.5 mi 74.9
GEB Solar Permitted Solar 6.3 mi 50
Rollins Solar Permitted Solar 7.7 mi 74.9
Shorthorn Solar Permitted Solar 9.3 mi 60
Culpepper Solar Permitted Solar 12.0 mi 74.9

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution