Halstad — Power plant · Oil · City of Halstad - (MN)
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Standby
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2007
Net generation, 2025
34 MWh
Grid
4 kV to City of Halstad - (MN) (MISO)
Location
Norman County, Minnesota
Operated by
City of Halstad - (MN)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
19 years since 2007
Heat rate
9,706 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
SB
Mw
4
Units
2
Standby mw
4
Status rule
majority_mw_standby
In service mw
4
Out of service mw
0
Fuel burned (MMBtu), 2025330
Capacity factor, 20250.001
Heat rate (Btu/kWh), 20259,705.9
Net generation (MWh), 202534
Balancing authority codeMISO

Retirement

Capacity retired
1.1 MW
Generators retired
3
Capacity still in service
4 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Petroleum Liquids0.6 MWRetiredApril 2005
2Petroleum Liquids0.3 MWRetiredApril 2005
3Petroleum Liquids0.2 MWRetiredApril 2005

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
4 kV
Transmission or distribution system owner
City of Halstad - (MN)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • In service · EIA-860M
  • Stated Units 1, 2, 3 scheduled to retire, 1.1 MW · EIA-860M