Hampton MN GRE — Power plant · Solar · SoCore Energy LLCMazaska Garden — Under construction · Solar · MN · 5 MW · 11.3 km awayGladiolus Solar, LLC — Postponed · Solar · MN · 1 MW · 19.3 km awayHydra Community Solar — Postponed · Solar · MN · 1 MW · 20.7 km awayJIMNIST LLC — Built · Large load · MN · 20.8 km away
  • Wind & solar
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Hampton MN GRE

Power plant · Solar

Key facts

Power plant · Solarran 17% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
3,048 MWh
Grid
12 kV to Dakota Electric Association (MISO)
Location
Dakota County, Minnesota
Operated by
SoCore Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2018 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
8 years since 2018
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000815992
Location id
L100000813293
Eia plant ids
62060
Grid
Nerc region
MRO
Report year
2025
Grid voltage kv
12.50
Transmission owner
Dakota Electric Association
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Fuel burned (MMBtu), 202510,400
Capacity factor, 20250.174
Net generation (MWh), 20253,048
Balancing authority codeMISO

Solar array

Array area (acres)
12.8
AC capacity (MW)
2
DC capacity (MW)
2.5
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2018

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Mazaska Garden Under construction Solar 11.3 km 5
Gladiolus Solar, LLC Postponed Solar 19.3 km 1
Hydra Community Solar Postponed Solar 20.7 km 1
JIMNIST LLC Built Large load 20.8 km