Show on map
Harrisburg 230 kV line — Transmission lineAREP DATA CENTER — Under construction · Large load · NC · 0.4 mi awayMcDowell Creek Solar LLC — Under construction · Solar · NC · 2 MW · 6.4 mi awayCLT 16 12MW DATA CENTER — Under construction · Large load · NC · 10.0 mi awayCLT16 - Data Center — Filed · Large load · NC · 10.1 mi awayHornet Solar — Under construction · Solar · NC · 73 MW · 11.2 mi awayDLR Moores Chapel Mobile Crane (Charlotte data centre) — Filed · Large load · NC · 13.0 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Harrisburg 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NC
Owner (as stated)
Duke Energy Carolinas

Details

Who’s behind it

Owner
Duke Energy Carolinas

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
10
Substations at the ends (as the source names them)
Harrisburg
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy carolinas
HIFLD line ID137506
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
AREP DATA CENTER Under construction Large load 0.4 mi
McDowell Creek Solar LLC Under construction Solar 6.4 mi 2
CLT 16 12MW DATA CENTER Under construction Large load 10.0 mi
CLT16 - Data Center Filed Large load 10.1 mi
Hornet Solar Under construction Solar 11.2 mi 73
DLR Moores Chapel Mobile Crane (Charlotte data centre) Filed Large load 13.0 mi

Sources EPA ICIS-NPDES · EIA-860M · FAA OE/AAA

Sources

Attribution