Show on map
Harrison - Belmont 500 kV — Transmission lineWolf Summit Energy — Filed · Gas, combined cycle · WV · 578.9 MW · 4.4 mi awayPurdys Run Energy, LLC — Postponed · Gas, reciprocating engine · WV · 22 MW · 5.9 mi awayDevola L&D Hydroelectric Project — Postponed · Hydro · OH · 4 MW · 13.0 mi away
  • Combustion
  • In development
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Harrison - Belmont 500 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
500 kV
States crossed
US-WV
Owner (as stated)
Monongahela Power

Details

Who’s behind it

Owner
Monongahela Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
54
Substations at the ends (as the source names them)
Harrison to Belmont
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itmonongahela power
HIFLD line ID145080
Voltage class500 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Wolf Summit Energy Filed Gas, combined cycle 4.4 mi 578.9
Purdys Run Energy, LLC Postponed Gas, reciprocating engine 5.9 mi 22
Devola L&D Hydroelectric Project Postponed Hydro 13.0 mi 4

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution