Show on map
Harrisonburg - Dayton 230 kV — Transmission lineROCKINGHAM MEMORIAL HOSPITAL DATA CENTER — Built · Large load · VA · 0.6 mi awayANTHEM CDC 3 — Built · Large load · VA · 3.8 mi awayTwins Solar — Postponed · Solar + storage · VA · 300 MW · 5.1 mi awaySun Ridge Solar — Under construction · Solar · VA · 50 MW · 10.0 mi awayElkton — Postponed · Solar · VA · 2.5 MW · 12.6 mi away
  • Wind & solar
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Harrisonburg - Dayton 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-VA
Owner (as stated)
Virginia Electric Power

Details

Who’s behind it

Owner
Virginia Electric Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
3
Substations at the ends (as the source names them)
Harrisonburg to Dayton
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itvirginia electric power
HIFLD line ID119375
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
ROCKINGHAM MEMORIAL HOSPITAL DATA CENTER Built Large load 0.6 mi
ANTHEM CDC 3 Built Large load 3.8 mi
Twins Solar Postponed Solar + storage 5.1 mi 300
Sun Ridge Solar Under construction Solar 10.0 mi 50
Elkton Postponed Solar 12.6 mi 2.5

Sources EPA ICIS-Air · Virginia DEQ · EIA-860M

Sources

  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • Virginia DEQOpen license · retrieved Nov 4, 2026Source: Virginia Department of Environmental Quality
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution