Show on map
- Combustion
- Loads
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Loads
- Operating
- Size not stated
Harry D Mattison Gas Plant: location and 2 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Harry D Mattison Gas Plant
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 7% of 2025 Standby- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2007
- Net generation, 2025
- 220,482 MWh
- Grid
- 161 kV to Southwestern Electric Power Co (SWPP)
- Location
- Washington County, Arkansas
- Operated by
- Southwestern Electric Power Co
Output
- Gas
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 19 years since 2007
- Heat rate
- 12,073 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Eia status |
|
| Fuel burned (MMBtu), 2025 | 2,661,882 |
| Capacity factor, 2025 | 0.072 |
| Heat rate (Btu/kWh), 2025 | 12,073 |
| Net generation (MWh), 2025 | 220,482 |
| Balancing authority code | SWPP |
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Southwestern Electric Power Co | Operator | EIA-860M | ||
| AMERICAN ELECTRIC POWER CO INC | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Genova Arkansas I LLC Postponed | Gas, combined cycle | 0.0 mi | 631.4 |
| WALMART EAST DATA CENTER/DAVID GLASS TECHNOLOGY CENTER Built | Large load | 13.5 mi |
Sources EIA-860M · EPA ICIS-Air