Show on map
Hartzog — Power plant · Gas, combustion turbine · Basin Electric Power CoopTwo Elk Generating Station — Postponed · Coal · WY · 320 MW · 7.9 mi away
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2002
Net generation, 2025
148 MWh
Grid
69 kV to Powder River Energy Corp (WACM)
Location
Campbell County, Wyoming
Operated by
Basin Electric Power CoopSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2025
Fuel burned MMBtu by year, 2002 to 2025
  • Gas

Operations detail

Details

Who’s behind it

Owner
Basin Electric Power CoopSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
24 years since 2002
Unused energy
197 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
17,122 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
69
Transmission owner
Powder River Energy Corp
Balancing authority code
WACM
Balancing authority name
Western Area Power Administration - Rocky Mountain Region
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110041362156
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1006357
Fuel burned (MMBtu), 20252,534
Capacity factor, 20250.001
Heat rate (Btu/kWh), 202517,121.6
Net generation (MWh), 2025148
Balancing authority codeWACM

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Two Elk Generating Station Postponed Coal 7.9 mi 320

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution