Show on map
Harvest — Power plant · Wind · Harvest Windfarm, LLCSilver Creek Solar Park — Under construction · Solar · MI · 200 MW · 7.6 mi away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Wind

Key facts

Power plant · Windran 25% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2008
Net generation, 2025
116,570 MWh
Grid
120 kV to ITC Interconnection LLC (MISO)
Location
Huron County, Michigan
Operated by
Harvest Windfarm, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2008 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
18 years since 2008
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
120
Transmission owner
ITC Interconnection LLC
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Fuel burned (MMBtu), 2025397,737
Capacity factor, 20250.252
Net generation (MWh), 2025116,570
Balancing authority codeMISO

Wind turbines

Turbines
32
Turbine capacity (MW)
52.8
Turbine models
32 Vestas V82-1.65
Hub height (m)
80
Rotor diameter (m)
82
Year online
2008

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Silver Creek Solar Park Under construction Solar 7.6 mi 200

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution