Hauser — Power plant · Hydro · NorthWestern Energy (MT Hydro)Hauser — Hydro · MT · 7 MW · 0.0 km away
  • Clean firm
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Hydro

Key facts

Power plant · Hydroran 87% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1911
Net generation, 2025
128,407 MWh
Grid
69 kV to NorthWestern Energy LLC - (MT) (NWMT)
Location
Lewis and Clark County, Montana
Operated by
NorthWestern Energy (MT Hydro)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
115 years since 1911
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 2025438,125
Capacity factor, 20250.873
Net generation (MWh), 2025128,407
Balancing authority codeNWMT

Retirement

EIA-860M September 2026StatusSome generators are scheduled to retire; most of the plant's capacity is not, so it is shown as operating. As of EIA-860M for September 2026.
Capacity retired
15.3 MW
Generators retired
5
Next scheduled retirement
June 2028
Capacity scheduled to retire
2.8 MW
Generators scheduled to retire
1
Share of in-service capacity scheduled
17%
Capacity still in service
16.8 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
HAU4Conventional Hydroelectric2.8 MWRetiredNovember 2017
HAU2Conventional Hydroelectric3.9 MWRetiredDecember 2019
HAU5Conventional Hydroelectric2.8 MWRetiredApril 2021
HAU1Conventional Hydroelectric2.8 MWRetiredSeptember 2023
HAU6Conventional Hydroelectric3 MWRetiredJuly 2025
HAU3Conventional Hydroelectric2.8 MWScheduled to retireJune 2028

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
NorthWestern Energy LLC - (MT)
Balancing authority
NorthWestern Energy (NWMT)
NERC region
WECC
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit HAU3 scheduled to retire, 2.8 MW · EIA-860M
  • Stated Unit HAU6 scheduled to retire, 3 MW · EIA-860M
  • Stated Unit HAU1 scheduled to retire, 2.8 MW · EIA-860M
  • Stated Unit HAU5 scheduled to retire, 2.8 MW · EIA-860M
  • Stated Unit HAU2 scheduled to retire, 3.9 MW · EIA-860M
  • Stated Unit HAU4 scheduled to retire, 2.8 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Hauser Announced Hydro 0.0 km 7

Sources EIA-860M