Hayden - Cole Road 345 kV — Transmission lineCMH091 CAMPUS — Built · Large load · OH · 0.4 mi awayPleasant Prairie Solar Energy LLC — Under construction · Solar · OH · 200 MW · 1.4 mi awayCMH052 — Built · Large load · OH · 3.1 mi awayKYNDRYL, INC. — Built · Large load · OH · 3.3 mi awayCMH086 CAMPUS — Built · Large load · OH · 4.0 mi awaySpringwater Solar, LLC — Under construction · Solar · OH · 155 MW · 9.6 mi awayCOLOGIX — Built · Large load · OH · 10.8 mi awayBuilding B (Marysville data centre) — Filed · Large load · OH · 12.9 mi awayLight Pole 2 (Marysville data centre) — Filed · Large load · OH · 13.6 mi awayCITI MIDWEST DATA CENTER — Built · Large load · OH · 13.6 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Hayden - Cole Road 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-OH
Owner (as stated)
American Electric Power

Details

Who’s behind it

Owner
American Electric Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
8
Substations at the ends (as the source names them)
Hayden to Cole Road
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itamerican electric power
HIFLD line ID179016
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CMH091 CAMPUS Built Large load 0.4 mi
Pleasant Prairie Solar Energy LLC Under construction Solar 1.4 mi 200
CMH052 Built Large load 3.1 mi
KYNDRYL, INC. Built Large load 3.3 mi
CMH086 CAMPUS Built Large load 4.0 mi
Springwater Solar, LLC Under construction Solar 9.6 mi 155
COLOGIX Built Large load 10.8 mi
Building B (Marysville data centre) Filed Large load 12.9 mi
Light Pole 2 (Marysville data centre) Filed Large load 13.6 mi
CITI MIDWEST DATA CENTER Built Large load 13.6 mi

Sources EPA ICIS-Air · EIA-860M · FAA OE/AAA