HEB00055 — Power plant · Gas, reciprocating engine · Generate ER-NG, LLCFTW DATA CENTER — Under construction · Large load · TX · 8.0 mi awayFTW1 DC1 Expansion (Roanoke data centre) — Filed · Large load · TX · 8.3 mi away2501 Edmonds Ln Lewisville TX Data Center — Filed · Large load · TX · 8.6 mi awayQTS 6431 Longhorn Dr. Irving TX — Built · Large load · TX · 9.2 mi awayQUALITY INVESTMENT PROPERTIES IRVING — Built · Large load · TX · 9.2 mi awayDFW SPE 2 (Fort Worth data centre) — Filed · Large load · TX · 10.5 mi awayAREP LAS COLINAS DATA CENTER — Under construction · Large load · TX · 11.6 mi awayLR 1300 (Irving data centre) — Filed · Large load · TX · 11.7 mi awayCORE SCIENTIFIC DATA CENTER SITE 1 AND 2 DENTON TEXAS — Built · Large load · TX · 12.9 mi away
  • Combustion
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 2% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
206 MWh
Grid
138 kV to Oncor Electric Delivery Company LLC (ERCO)
Location
Tarrant County, Texas
Operated by
Generate ER-NG, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2023 to 2025
Fuel burned MMBtu by year, 2023 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
3 years since 2023
Unused energy
10 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
14,116 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
Oncor Electric Delivery Company LLC
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20252,908
Capacity factor, 20250.020
Heat rate (Btu/kWh), 202514,116.5
Net generation (MWh), 2025206
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
FTW DATA CENTER Under construction Large load 8.0 mi
FTW1 DC1 Expansion (Roanoke data centre) Filed Large load 8.3 mi
2501 Edmonds Ln Lewisville TX Data Center Filed Large load 8.6 mi
QTS 6431 Longhorn Dr. Irving TX Built Large load 9.2 mi
QUALITY INVESTMENT PROPERTIES IRVING Built Large load 9.2 mi
DFW SPE 2 (Fort Worth data centre) Filed Large load 10.5 mi
AREP LAS COLINAS DATA CENTER Under construction Large load 11.6 mi
LR 1300 (Irving data centre) Filed Large load 11.7 mi
CORE SCIENTIFIC DATA CENTER SITE 1 AND 2 DENTON TEXAS Built Large load 12.9 mi

Sources EPA ICIS-NPDES · FAA OE/AAA · EPA ICIS-Air