Show on map
HEB00750 — Power plant · Gas, reciprocating engine · Generate ER-NG, LLCAREP Powerhouse Crane (Midlothian data centre) — Filed · Large load · TX · 6.8 mi awayFort Watt Storage — Postponed · Storage · TX · 200 MW · 7.4 mi awayWAL4279 — Postponed · Gas, reciprocating engine · TX · 1.2 MW · 8.5 mi awayTX 14 Venus Mill Storage — Postponed · Storage · TX · 100 MW · 9.0 mi awaySHARKA — Built · Large load · TX · 9.2 mi awayCedar Hill ESS — Filed · Storage · TX · 10 MW · 11.5 mi awayEmerald Hill Energy Storage — Postponed · Storage · TX · 250 MW · 14.0 mi away
  • Combustion
  • Storage
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 2% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
247 MWh
Grid
138 kV to Oncor Electric Delivery Company LLC (ERCO)
Location
Tarrant County, Texas
Operated by
Generate ER-NG, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025
Fuel burned MMBtu by year, 2024 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
2 years since 2024
Unused energy
10 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
14,263 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
Oncor Electric Delivery Company LLC
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20253,523
Capacity factor, 20250.024
Heat rate (Btu/kWh), 202514,263.2
Net generation (MWh), 2025247
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
AREP Powerhouse Crane (Midlothian data centre) Filed Large load 6.8 mi
Fort Watt Storage Postponed Storage 7.4 mi 200
WAL4279 Postponed Gas, reciprocating engine 8.5 mi 1.2
TX 14 Venus Mill Storage Postponed Storage 9.0 mi 100
SHARKA Built Large load 9.2 mi
Cedar Hill ESS Filed Storage 11.5 mi 10
Emerald Hill Energy Storage Postponed Storage 14.0 mi 250

Sources FAA OE/AAA · EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES

Sources

Attribution