HEB00760 — Power plant · Gas, reciprocating engine · Generate ER-NG, LLCTX17 Nickel Prairie Storage — Storage · TX · 100 MW · 15.1 km awayBocanova Energy Storage II — Storage · TX · 150 MW · 16.0 km awayPamela Heights I Energy Center — Storage · TX · 101.7 MW · 18.1 km awayCallisto II Energy Center — Storage · TX · 303.2 MW · 18.1 km awayCrowned Heron 2 - Storage, LLC — Storage · TX · 154.2 MW · 20.8 km awayRock N' Roll — Solar + storage · TX · 358 MW · 21.0 km awayJack Fusco Energy Center — Gas, combined cycle · TX · 400 MW · 21.3 km awayCradle Solar — Solar · TX · 225 MW · 21.5 km awayBodkin BESS — Storage · TX · 75 MW · 24.0 km away
  • Combustion
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 2% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
205 MWh
Grid
138 kV to CenterPoint Energy (ERCO)
Location
Brazoria County, Texas
Operated by
Generate ER-NG, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2023 to 2025
Fuel burned MMBtu by year, 2023 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
3 years since 2023
Unused energy
10 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
15,907 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20253,261
Capacity factor, 20250.019
Heat rate (Btu/kWh), 202515,907.3
Net generation (MWh), 2025205
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
TX17 Nickel Prairie Storage Postponed Storage 15.1 km 100
Bocanova Energy Storage II Under construction Storage 16.0 km 150
Pamela Heights I Energy Center Under construction Storage 18.1 km 101.7
Callisto II Energy Center Under construction Storage 18.1 km 303.2
Crowned Heron 2 - Storage, LLC Built Storage 20.8 km 154.2
Rock N' Roll Studied Solar + storage 21.0 km 358
Jack Fusco Energy Center Postponed Gas, combined cycle 21.3 km 400
Cradle Solar Postponed Solar 21.5 km 225
Bodkin BESS Permitted Storage 24.0 km 75

Sources EIA-860M · ERCOT