Show on map
HEB00794 — Power plant · Gas, reciprocating engine · Generate ER-NG, LLCALIGNED DATA CENTER MEMORY TECH PHASE 1 ADDITION — Built · Large load · TX · 11.9 mi awayFLEXENTIAL DATA CENTER EXPANSION — Built · Large load · TX · 12.1 mi awayEDGECORE DATACENTER - FUJITSU CAMPUS ADDITION — Large load · TX · 13.5 mi awayBANK OF AMERICA - RTX MODULAR DATA CENTER — Built · Large load · TX · 13.6 mi awaySDC DFW-VII DATA CENTER PHASE 2 — Built · Large load · TX · 14.0 mi awayRAGINGWIRE DATA CENTER — Built · Large load · TX · 14.1 mi awayNTT TX-4 DATA CENTER — Under construction · Large load · TX · 14.2 mi awayCrane DLR37 (Garland data centre) — Filed · Large load · TX · 14.4 mi away
  • Combustion
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 1% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
154 MWh
Grid
138 kV to CenterPoint Energy (ERCO)
Location
Collin County, Texas
Operated by
Generate ER-NG, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2023 to 2025
Fuel burned MMBtu by year, 2023 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
3 years since 2023
Unused energy
10 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
14,909 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
CenterPoint Energy
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20252,296
Capacity factor, 20250.015
Heat rate (Btu/kWh), 202514,909.1
Net generation (MWh), 2025154
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
ALIGNED DATA CENTER MEMORY TECH PHASE 1 ADDITION Built Large load 11.9 mi
FLEXENTIAL DATA CENTER EXPANSION Built Large load 12.1 mi
EDGECORE DATACENTER - FUJITSU CAMPUS ADDITION Unknown Large load 13.5 mi
BANK OF AMERICA - RTX MODULAR DATA CENTER Built Large load 13.6 mi
SDC DFW-VII DATA CENTER PHASE 2 Built Large load 14.0 mi
RAGINGWIRE DATA CENTER Built Large load 14.1 mi
NTT TX-4 DATA CENTER Under construction Large load 14.2 mi
Crane DLR37 (Garland data centre) Filed Large load 14.4 mi

Sources EPA ICIS-NPDES · FAA OE/AAA

Sources

Attribution