HEB00796 — Power plant · Gas, reciprocating engine · Generate ER-NG, LLCFLEXENTIAL DATA CENTER EXPANSION — Large load · TX · 12.1 km awayALIGNED DATA CENTER MEMORY TECH PHASE 1 ADDITION — Large load · TX · 12.2 km awayBANK OF AMERICA - RTX MODULAR DATA CENTER — Large load · TX · 14.2 km awayEDGECORE DATACENTER - FUJITSU CAMPUS ADDITION — Large load · TX · 14.3 km awaySDC DFW-VII DATA CENTER PHASE 2 — Large load · TX · 14.8 km awayRAGINGWIRE DATA CENTER — Large load · TX · 15.1 km awayNTT TX-4 DATA CENTER — Large load · TX · 15.3 km awayCrane DLR37 (Garland data centre) — Large load · TX · 15.4 km awayBoxcar Energy Storage — Storage · TX · 150 MW · 16.5 km awayMallard Energy Storage — Storage · TX · 250 MW · 19.7 km away
  • Combustion
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 1% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2023
Net generation, 2025
146 MWh
Grid
138 kV to Oncor Electric Delivery Company LLC (ERCO)
Location
Collin County, Texas
Operated by
Generate ER-NG, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2023 to 2025
Fuel burned MMBtu by year, 2023 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
3 years since 2023
Unused energy
10 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
14,932 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
Oncor Electric Delivery Company LLC
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20252,180
Capacity factor, 20250.014
Heat rate (Btu/kWh), 202514,931.5
Net generation (MWh), 2025146
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
FLEXENTIAL DATA CENTER EXPANSION Built Large load 12.1 km
ALIGNED DATA CENTER MEMORY TECH PHASE 1 ADDITION Built Large load 12.2 km
BANK OF AMERICA - RTX MODULAR DATA CENTER Built Large load 14.2 km
EDGECORE DATACENTER - FUJITSU CAMPUS ADDITION Unknown Large load 14.3 km
SDC DFW-VII DATA CENTER PHASE 2 Built Large load 14.8 km
RAGINGWIRE DATA CENTER Built Large load 15.1 km
NTT TX-4 DATA CENTER Under construction Large load 15.3 km
Crane DLR37 (Garland data centre) Filed Large load 15.4 km
Boxcar Energy Storage Under construction Storage 16.5 km 150
Mallard Energy Storage Under construction Storage 19.7 km 250