Show on map
HEB00801 — Power plant · Gas, reciprocating engine · Generate ER-NG, LLCCyrusOne DFW 7 — Large load · TX · 7.8 km awayACS DFW Hicks Field Rd (Fort Worth data centre) — Large load · TX · 8.4 km awayFTW DATA CENTER — Large load · TX · 9.2 km awayDFW SPE 2 (Fort Worth data centre) — Large load · TX · 9.3 km awayFTW1 DC1 Expansion (Roanoke data centre) — Large load · TX · 9.5 km awayEagle Mountain — Gas, combined cycle · TX · 853.5 MW · 15.9 km away
  • Combustion
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 2% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
227 MWh
Grid
138 kV to Oncor Electric Delivery Company LLC (ERCO)
Location
Tarrant County, Texas
Operated by
Generate ER-NG, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025
Fuel burned MMBtu by year, 2024 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
2 years since 2024
Unused energy
10 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
14,212 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
Oncor Electric Delivery Company LLC
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20253,226
Capacity factor, 20250.022
Heat rate (Btu/kWh), 202514,211.5
Net generation (MWh), 2025227
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
CyrusOne DFW 7 Filed Large load 7.8 km
ACS DFW Hicks Field Rd (Fort Worth data centre) Filed Large load 8.4 km
FTW DATA CENTER Under construction Large load 9.2 km
DFW SPE 2 (Fort Worth data centre) Filed Large load 9.3 km
FTW1 DC1 Expansion (Roanoke data centre) Filed Large load 9.5 km
Eagle Mountain Postponed Gas, combined cycle 15.9 km 853.5