Heber Geothermal — Power plant · Geothermal · ORCAL Geothermal, IncImperial Valley Solar, LLC — Postponed · Solar · CA · 400 MW · 5.0 mi awayEl Centro Hybrid — Announced · Gas, reciprocating engine · CA · 112.8 MW · 6.2 mi awayBig Rock Solar Farm — Postponed · Solar · CA · 200 MW · 11.4 mi awayKingsley Solar Farm — Withdrawn · Solar + storage · CA · 299 MW · 12.8 mi awayImperial Sun Solar — Filed · Solar + storage · CA · 200 MW · 13.0 mi awayCE&P Imperial Valley 1 — Permitted · Other · CA · 50 MW · 13.7 mi away
  • Combustion
  • Clean firm
  • Wind & solar
  • Unspecified fuel
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Heber Geothermal

Power plant · Geothermal

Key facts

Power plant · Geothermalran 47% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2006
Net generation, 2025
376,280 MWh
Grid
92 kV to Imperial Irrigation District (IID)
Location
Imperial County, California

Output

Net generation MWh by year, 2001 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Geothermal source: “Geothermal”
Age
20 years since 2006
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000700097
Location id
L100000700062
Eia plant ids
54689
Fuel burned (MMBtu), 20251,283,868
Capacity factor, 20250.469
Net generation (MWh), 2025376,280
Balancing authority codeIID

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
59 MW
Generators retired
2
Capacity still in service
91.5 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Geothermal52 MWRetiredMarch 2023
2Geothermal7 MWRetiredAugust 2023

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
92 kV
Transmission or distribution system owner
Imperial Irrigation District
Balancing authority
Imperial Irrigation District
NERC region
WECC
Transmission lines within 15 mi (8)
Connection points within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
ORCAL Geothermal, Inc Operator EIA-860M
Ormat Nevada Inc Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • Stated Unit 2 scheduled to retire, 7 MW · EIA-860M
  • Stated Unit 1 scheduled to retire, 52 MW · EIA-860M
  • In service · EIA-860M

Sources

7 sources

Sources EIA-860M · GEM · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Imperial Valley Solar, LLC Postponed Solar 5.0 mi 400
El Centro Hybrid Announced Gas, reciprocating engine 6.2 mi 112.8
Big Rock Solar Farm Postponed Solar 11.4 mi 200
Kingsley Solar Farm Withdrawn Solar + storage 12.8 mi 299
Imperial Sun Solar Filed Solar + storage 13.0 mi 200
CE&P Imperial Valley 1 Permitted Other 13.7 mi 50

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO