Show on map
Hecate Energy Blair Road LLC — Power plant · Solar · Hecate Energy Blair Road LLCFRP Miller Solar — Under construction · Solar + storage · FL · 124.5 MW · 5.3 mi awayFRP Forest Trail Solar — Under construction · Solar · FL · 50 MW · 10.7 mi away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Hecate Energy Blair Road LLC

Power plant · Solar

Key facts

Power plant · Solarran 17% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
5,825 MWh
Grid
23 kV to JEA (JEA)
Location
Duval County, Florida
Operated by
Hecate Energy Blair Road LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2018 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
8 years since 2018
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000816035
Location id
L100000813335
Eia plant ids
62778
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
23
Transmission owner
JEA
Balancing authority code
JEA
Balancing authority name
JEA
Fuel burned (MMBtu), 202519,875
Capacity factor, 20250.166
Net generation (MWh), 20255,825
Balancing authority codeJEA

Solar array

Array area (acres)
16.9
AC capacity (MW)
4.2
DC capacity (MW)
4.9
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2018

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
FRP Miller Solar Under construction Solar + storage 5.3 mi 124.5
FRP Forest Trail Solar Under construction Solar 10.7 mi 50

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution