Show on map
- Storage
- Operating
- 10 · 100 · 1,000 MW
Map
- Storage
- Operating
Hecate Energy Desert Storage 1 LLC: location and 5 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Hecate Energy Desert Storage 1 LLC
Power plant · Storage
Key facts
Power plant · Storage Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2025
- Net generation, 2025
- -1,107 MWh
- Grid
- 33 kV to Southern California Edison Co (CISO)
- Location
- Riverside County, California
- Operated by
- Hecate Energy Desert Storage 1 LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Storage source: “Batteries”
- Age
- 1 year since 2025
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | -1,107 |
| Balancing authority code | CISO |
Data notes (1)
- Capacity factor, 2025 not shown: net generation -1107.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Solar Photovoltaic Project #45 Postponed | Solar | 5.6 mi | 6 |
| Painted Hills IV Wind Withdrawn | Wind | 10.8 mi | 19.5 |
| Painted Hills Postponed | Wind | 11.1 mi | 17.5 |
| Westwind Trust Postponed | Wind | 11.3 mi | 15.6 |
| Alta Mesa Project Phase IV Postponed | Wind | 13.6 mi | 40 |