Show on map
Henderson — Power plant · Gas, steam turbine · Greenwood Utilities Comm
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 0% of 2018 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1960
Net generation, 2018
2,606 MWh
Location
Leflore County, Mississippi
Operated by
Greenwood Utilities CommSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2018
Fuel burned MMBtu by year, 2001 to 2018
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
66 years since 1960
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeMISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
June 2018
Capacity retired
59 MW
Generators retired
11
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Natural Gas Steam Turbine12.6 MWRetiredJune 2018
3Natural Gas Steam Turbine20 MWRetiredJune 2018
H10Natural Gas Internal Combustion Engine1.3 MWRetiredJune 2018
H11Natural Gas Internal Combustion Engine1.3 MWRetiredJune 2018
H2Natural Gas Fired Combustion Turbine13.5 MWRetiredJune 2018
H4Petroleum Liquids1.8 MWRetiredJune 2018
H5Petroleum Liquids1.8 MWRetiredJune 2018
H6Petroleum Liquids1.8 MWRetiredJune 2018
H7Petroleum Liquids1.8 MWRetiredJune 2018
H8Petroleum Liquids1.8 MWRetiredJune 2018
H9Natural Gas Internal Combustion Engine1.3 MWRetiredJune 2018
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Steam Turbine32.6 MW
Natural Gas Fired Combustion Turbine13.5 MW
Petroleum Liquids9 MW
Natural Gas Internal Combustion Engine3.9 MW

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
MISO
Transmission lines within 25 km (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 3, H10, H11, H2, H4, H5, H6, H7, H8, H9 scheduled to retire, 59 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source