Show on map
Henne - Zorn 138 kV — Transmission lineCLOUDBURST DATA CENTERS — Under construction · Large load · TX · 1.4 mi awayClear Springs Energy Center — Postponed · Gas, combustion turbine · TX · 549 MW · 8.8 mi awayGuadalupe Generating Station — Postponed · Gas, combustion turbine · TX · 320 MW · 11.6 mi away
  • Loads
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Henne - Zorn 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Owner (as stated)
Pedernales Electric Coop

Details

Who’s behind it

Owner
Pedernales Electric Coop

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
7
Substations at the ends (as the source names them)
Henne to Zorn
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpedernales electric coop
HIFLD line ID309672
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CLOUDBURST DATA CENTERS Under construction Large load 1.4 mi
Clear Springs Energy Center Postponed Gas, combustion turbine 8.8 mi 549
Guadalupe Generating Station Postponed Gas, combustion turbine 11.6 mi 320

Sources EPA ICIS-NPDES · EIA-860M

Sources

Attribution