Show on map
Hennepin 138 kV line — Transmission lineUSS Grandpa Solar — Postponed · Solar · IL · 1 MW · 3.9 mi awayLadd Solar 3 — Under construction · Solar · IL · 4.5 MW · 8.4 mi awaySouth Cherry Solar 1 — Under construction · Solar · IL · 5 MW · 9.5 mi awaySolitude — Under construction · Solar · IL · 5 MW · 9.9 mi awaySV CSG Naplate — Under construction · Solar · IL · 3.9 MW · 10.1 mi awayArlington 1 — Under construction · Solar · IL · 4.5 MW · 10.5 mi awayArlington 2 — Under construction · Solar · IL · 4.5 MW · 10.5 mi awayCherry Solar 1 — Under construction · Solar · IL · 5 MW · 11.2 mi awayBureau Solar 2 LLC — Under construction · Solar · IL · 2.5 MW · 13.7 mi away
  • Wind & solar
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Hennepin 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-IL
Owner (as stated)
Ameren Illinois

Details

Who’s behind it

Owner
Ameren Illinois

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
14
Substations at the ends (as the source names them)
Hennepin
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itameren illinois
HIFLD line ID146055
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
USS Grandpa Solar Postponed Solar 3.9 mi 1
Ladd Solar 3 Under construction Solar 8.4 mi 4.5
South Cherry Solar 1 Under construction Solar 9.5 mi 5
Solitude Under construction Solar 9.9 mi 5
SV CSG Naplate Under construction Solar 10.1 mi 3.9
Arlington 1 Under construction Solar 10.5 mi 4.5
Arlington 2 Under construction Solar 10.5 mi 4.5
Cherry Solar 1 Under construction Solar 11.2 mi 5
Bureau Solar 2 LLC Under construction Solar 13.7 mi 2.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution