Show on map
Hernando — Power plant · Biomass · Hernando Energy
  • Bioenergy
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Biomass

Key facts

Power plant · Biomassran 33% of 2024 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2010
Net generation, 2024
4,682 MWh
Grid
23 kV to Seminole Electric Cooperative Inc (SEC)
Location
Hernando County, Florida
Operated by
Hernando Energy

Operations

Net generation, 2024
4,682MWh
Fuel burned, 2024
47,738MMBtu
Capacity factor, 2024
33.3%
Heat rate, 2024
10,196Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
2025 (10 of 12 months)00——
20244,68247,73833.3%10,196
20239,65998,04768.9%10,151
202212,499145,09389.2%11,608
202113,001153,89392.8%11,837
202013,562171,09096.5%12,615
201910,208119,69372.8%11,725
201810,603118,98175.6%11,221
201711,015115,59878.6%10,495
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

Every source and license · Attribution