Hiawatha - Arnold 161 kV — Transmission lineData Center — Filed · Large load · IA · 10.2 mi awayCedar Rapids Data Center — Filed · Large load · IA · 10.4 mi awayQTS East Data Center - Temporary Crane — Filed · Large load · IA · 11.0 mi awayQTS Data Center — Filed · Large load · IA · 11.1 mi awayMobile Cranes (Cedar Rapids data centre) — Filed · Large load · IA · 11.2 mi awaySuffolk/DataCenter/MobileCrane/DC5/Laydown — Filed · Large load · IA · 11.4 mi away
  • Loads
  • In development
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Hiawatha - Arnold 161 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
161 kV
States crossed
US-IA
Owner (as stated)
Midamerican Energy

Details

Who’s behind it

Owner
Midamerican Energy

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
8
Substations at the ends (as the source names them)
Hiawatha to Arnold
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itmidamerican energy
HIFLD line ID130406
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Data Center Filed Large load 10.2 mi
Cedar Rapids Data Center Filed Large load 10.4 mi
QTS East Data Center - Temporary Crane Filed Large load 11.0 mi
QTS Data Center Filed Large load 11.1 mi
Mobile Cranes (Cedar Rapids data centre) Filed Large load 11.2 mi
Suffolk/DataCenter/MobileCrane/DC5/Laydown Filed Large load 11.4 mi

Sources FAA OE/AAA

Sources

  • FAA OE/AAAOpen license · retrieved Nov 16, 2026

Attribution