Show on map
Higgins — Power plant · Gas, combustion turbine · Duke Energy Florida, LLCSouth Tampa Energy Storage — Storage · FL · 20 MW · 21.2 km away
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 1% of 2019 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1969
Net generation, 2019
15,999 MWh
Grid
115 kV to Duke Energy Florida, Inc (FPC)
Location
Pinellas County, Florida
Operated by
Duke Energy Florida, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2019
Fuel burned MMBtu by year, 2001 to 2019
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
57 years since 1969
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeFPC

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2019
First unit retired
March 2019
Capacity retired
153.2 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
P1Natural Gas Fired Combustion Turbine33.7 MWRetiredMarch 2019
P2Natural Gas Fired Combustion Turbine33.7 MWRetiredDecember 2019
P3Natural Gas Fired Combustion Turbine42.9 MWRetiredDecember 2019
P4Natural Gas Fired Combustion Turbine42.9 MWRetiredDecember 2019

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
Duke Energy Florida, Inc
Balancing authority
Progress Energy Florida
NERC region
SERC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units P2, P3, P4 scheduled to retire, 119.5 MW · EIA-860M
  • Stated Unit P1 scheduled to retire, 33.7 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
South Tampa Energy Storage Postponed Storage 21.2 km 20

Sources EIA-860M

Sources

Attribution