Show on map
High Hill Switching Station 115 kV line — Transmission lineBorrego - Highland Ave — Under construction · Solar + storage · MA · 10 MW · 3.1 mi awayMA Acushnet 540R Main St — Filed · Solar + storage · MA · 6 MW · 5.2 mi awayClems Way Solar — Permitted · Solar · MA · 5 MW · 5.3 mi awayFeatherbed Lane South Solar — Under construction · Solar + storage · MA · 2 MW · 6.1 mi awayCushman Road Solar — Filed · Solar + storage · MA · 6 MW · 6.2 mi awayBraley Hill North Solar — Under construction · Solar + storage · MA · 10 MW · 6.5 mi awaySnipatuit Road Solar — Under construction · Solar + storage · MA · 8 MW · 7.0 mi awayLogging Swamp South — Permitted · Solar · MA · 5 MW · 7.4 mi awayLogging Swamp North — Permitted · Solar · MA · 5 MW · 7.4 mi awayCONGRUITY 360 LLC — Built · Large load · MA · 7.4 mi awayRandall Lane Solar — Under construction · Solar + storage · MA · 10 MW · 8.1 mi awayBlueWave Capital-Mattapoisett (SREC II) — Postponed · Solar · MA · 4.5 MW · 8.2 mi awaySalt Cod BESS — Filed · Storage · MA · 168 MW · 8.3 mi awayTiverton Power Plant — Postponed · Gas, combined cycle · RI · 289.8 MW · 8.9 mi awaySolar Carver 1 Hybrid — Under construction · Solar + storage · MA · 4 MW · 14.7 mi awaySolar Carver 3 Hybrid — Under construction · Solar + storage · MA · 2 MW · 14.7 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

High Hill Switching Station 115 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
115 kV
States crossed
US-MA
Owner (as stated)
Nstar Electric

Details

Who’s behind it

Owner
Nstar Electric

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
2
Substations at the ends (as the source names them)
High Hill Switching Station
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itnstar electric
HIFLD line ID142389
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Borrego - Highland Ave Under construction Solar + storage 3.1 mi 10
MA Acushnet 540R Main St Filed Solar + storage 5.2 mi 6
Clems Way Solar Permitted Solar 5.3 mi 5
Featherbed Lane South Solar Under construction Solar + storage 6.1 mi 2
Cushman Road Solar Filed Solar + storage 6.2 mi 6
Braley Hill North Solar Under construction Solar + storage 6.5 mi 10
Snipatuit Road Solar Under construction Solar + storage 7.0 mi 8
Logging Swamp South Permitted Solar 7.4 mi 5
Logging Swamp North Permitted Solar 7.4 mi 5
CONGRUITY 360 LLC Built Large load 7.4 mi
Randall Lane Solar Under construction Solar + storage 8.1 mi 10
BlueWave Capital-Mattapoisett (SREC II) Postponed Solar 8.2 mi 4.5
Salt Cod BESS Filed Storage 8.3 mi 168
Tiverton Power Plant Postponed Gas, combined cycle 8.9 mi 289.8
Solar Carver 1 Hybrid Under construction Solar + storage 14.7 mi 4
Solar Carver 3 Hybrid Under construction Solar + storage 14.7 mi 2

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution