High Plains: location and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
High Plains
Power plant · Wind
Key facts
Power plant · Windran 22% of 2019 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2008
- Net generation, 2019
- 19,498 MWh
- Location
- Carson County, Texas
- Operated by
- High Plains Wind Power LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Wind source: “Onshore Wind Turbine”
- Age
- 18 years since 2008
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Balancing authority code | SWPP |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- March 2020
- Capacity retired
- 10 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 10 MW | Retired | March 2020 |
Grid
EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).- Balancing authority
- SWPP
Transmission lines within 15 mi (10)
- 115 kV line (OSM way 463732759)
- Sharyland Utilities 345 kV line (OSM way 453589178)
- 115 kV line (OSM way 463732760)
- 115 kV line (OSM way 463732761)
- 115 kV line (OSM way 463732689)
- 115 kV line (OSM way 463732747)
- 115 kV line (OSM way 20760040)
- 115 kV line (OSM way 463732758)
- 115 kV line (OSM way 463732757)
- 115 kV line (OSM way 463732687)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 1 scheduled to retire, 10 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
© OpenStreetMap contributors
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- OpenStreetMap© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Majestic 2 Wind Farm Postponed | Wind | 3.9 mi | 79.2 |
| Project Matador Gas Plant (PMG) Under construction | Gas, combined cycle | 4.9 mi | 11,679.3 |
| Project Matador Nuclear Announced | Nuclear | 4.9 mi | 4,468 |
Sources EIA-860M