Show on map
Highway Junction - Skaggs Island Junction 115 kV — Transmission lineAmerican Canyon RV Boat Storage — Under construction · Solar · CA · 1.9 MW · 2.1 mi awayDynamo Solar LLC — Contracted · Solar · CA · 24.5 MW · 4.8 mi awaySCWA R5 Pond Solar — Postponed · Solar · CA · 2 MW · 7.8 mi awayValero Refinery Cogeneration Unit 2 — Postponed · Gas, other · CA · 51 MW · 8.9 mi awayRichmond Cogen — Postponed · Gas, combined cycle · CA · 43 MW · 14.4 mi away
  • Wind & solar
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Highway Junction - Skaggs Island Junction 115 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
115 kV
States crossed
US-CA
Owner (as stated)
Pacific Gas Electric

Details

Who’s behind it

Owner
Pacific Gas Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
7
Substations at the ends (as the source names them)
Highway Junction to Skaggs Island Junction
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpacific gas electric
HIFLD line ID301730
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
American Canyon RV Boat Storage Under construction Solar 2.1 mi 1.9
Dynamo Solar LLC Contracted Solar 4.8 mi 24.5
SCWA R5 Pond Solar Postponed Solar 7.8 mi 2
Valero Refinery Cogeneration Unit 2 Postponed Gas, other 8.9 mi 51
Richmond Cogen Postponed Gas, combined cycle 14.4 mi 43

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 19, 2026Source: California ISO

Attribution