Power plant · Hydro

Key facts

Power plant · Hydroran 58% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2003
Net generation, 2025
30,517 MWh
Grid
115 kV to Niagara Mohawk Power Corp. (NYIS)
Location
St Lawrence County, New York

Output

Net generation MWh by year, 2001 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
23 years since 2003
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 2025104,122
Capacity factor, 20250.581
Net generation (MWh), 202530,517
Balancing authority codeNYIS

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
6 MW
Generators retired
3
Capacity still in service
6 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Conventional Hydroelectric2 MWRetiredSeptember 2003
2Conventional Hydroelectric2 MWRetiredSeptember 2003
3Conventional Hydroelectric2 MWRetiredSeptember 2003

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
115 kV
Transmission or distribution system owner
Niagara Mohawk Power Corp.
Balancing authority
New York Independent System Operator
NERC region
NPCC
Transmission lines within 15 mi (4)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleAs ofSource
Erie Boulevard Hydropower LP Operator EIA-860M
BRASCAN Power Corporation Owner Dec 31, 2025 EIA-860

Timeline

  • Stated Units 1, 2, 3 scheduled to retire, 6 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Grassy Grove Solar East Under construction Solar 12.2 mi 4.9
Rich Road Solar Energy Center Filed Solar 13.2 mi 240