Hillburn — Power plant · Gas, combustion turbine · Alliance NYGT, LLCNYSE DATA CENTER CRANE — Filed · Large load · NJ · 3.3 mi awayORANGETOWN DATA CENTER — Built · Large load · NY · 11.3 mi awayBowline Point — Postponed · Gas, combined cycle · NY · 750 MW · 11.5 mi awayDATA CENTER BUILDING EXPANSION — Under construction · Large load · NY · 11.8 mi away
  • Combustion
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1972
Net generation, 2025
701 MWh
Grid
69 kV to Orange & Rockland Utils Inc (NYIS)
Location
Rockland County, New York

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
54 years since 1972
Unused energy
407 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
17,114 Btu/kWh 2025
All 8 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
C&S Worldwide Holdings Inc
Share pct
100
Gem entity id
E100002016346
Unit ids
G100001054051
Location id
L100001047476
Eia plant ids
2628
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
69
Transmission owner
Orange & Rockland Utils Inc
Balancing authority code
NYIS
Balancing authority name
New York Independent System Operator
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110071160162
Subparts reported
D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1007157
Fuel burned (MMBtu), 202511,997
Capacity factor, 20250.002
Heat rate (Btu/kWh), 202517,114.1
Net generation (MWh), 2025701
Balancing authority codeNYIS

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Alliance NYGT, LLC Operator EIA-860M
Alliance Energy Group LLC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
NYSE DATA CENTER CRANE Filed Large load 3.3 mi
ORANGETOWN DATA CENTER Built Large load 11.3 mi
Bowline Point Postponed Gas, combined cycle 11.5 mi 750
DATA CENTER BUILDING EXPANSION Under construction Large load 11.8 mi

Sources FAA OE/AAA · EPA ICIS-Air · EIA-860M · EPA ICIS-NPDES