Show on map
Hines Energy Complex - Fort Meade 230 kV — Transmission lineTide Bay — Postponed · Solar · FL · 74.9 MW · 0.2 mi awayHines Energy Complex — Postponed · Gas, combined cycle · FL · 1,034 MW · 0.2 mi awayBrewster Solar — Under construction · Solar · FL · 40 MW · 5.5 mi awayPolk — Postponed · Gas, combined cycle · FL · 1,858.8 MW · 7.4 mi awayUnknown — Postponed · Oil · FL · 1,560 MW · 8.4 mi awayMidulla Generating Station — Postponed · Oil · FL · 555 MW · 9.8 mi awayMattaniah Solar — Under construction · Solar · FL · 52 MW · 12.8 mi away
  • Wind & solar
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Hines Energy Complex - Fort Meade 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-FL
Owner (as stated)
Duke Energy Florida

Details

Who’s behind it

Owner
Duke Energy Florida

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
6
Substations at the ends (as the source names them)
Hines Energy Complex to Fort Meade
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itduke energy florida
HIFLD line ID132417
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Tide Bay Postponed Solar 0.2 mi 74.9
Hines Energy Complex Postponed Gas, combined cycle 0.2 mi 1,034
Brewster Solar Under construction Solar 5.5 mi 40
Polk Postponed Gas, combined cycle 7.4 mi 1,858.8
Unknown Postponed Oil 8.4 mi 1,560
Midulla Generating Station Postponed Oil 9.8 mi 555
Mattaniah Solar Under construction Solar 12.8 mi 52

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution