Polk
Gas, combined cycle
Key facts
Gas, combined cycle Postponed (source status: Canceled or Postponed) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Interconnection queue
- Tampa Electric (TEC)
- Location
- Polk County, Florida
Details
Who’s behind it
- Developer
- Tampa Electric Co · part of Emera IncOwnership claimOwnership link recorded from its source; no date stated by the source.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Capacity (MW)
- 1,858.8 Capacity is the sum of the 4 generators listed under Sources.
- EIA plant
- 7242 4 generatorsEIA generatorsPlant 7242 6, 7, 8, 9
Timeline
- Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Brewster Solar Under construction | Solar | 1.9 mi | 40 |
| Midulla Generating Station Postponed | Oil | 6.2 mi | 555 |
| Tide Bay Postponed | Solar | 7.9 mi | 74.9 |
| Hines Energy Complex Postponed | Gas, combined cycle | 8.4 mi | 1,034 |
| Unknown Postponed | Oil | 11.3 mi | 1,560 |
| Mattaniah Solar Under construction | Solar | 11.9 mi | 52 |
Sources EIA-860M