Holden — Power plant · Gas, combustion turbine · Associated Electric Coop, Inc
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 8% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2002
Net generation, 2025
222,664 MWh
Grid
161 kV, 69 kV to Associated Electric Coop, Inc (AECI)
Location
Johnson County, Missouri
Operated by
Associated Electric Coop, IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2025
Fuel burned MMBtu by year, 2002 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Owner
Associated Electric Coop, IncSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of 31 Dec 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
24 years since 2002
Unused energy
2,592 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
12,161 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
161, 69
Transmission owner
Associated Electric Coop, Inc
Balancing authority code
AECI
Balancing authority name
Associated Electric Cooperative, Inc.
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110015869826
Subparts reported
C, D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1007746
Fuel burned (MMBtu), 20252,707,759
Capacity factor, 20250.079
Heat rate (Btu/kWh), 202512,160.7
Net generation (MWh), 2025222,664.0
Balancing authority codeAECI

Timeline

  • In service · EIA-860M