Show on map
- Loads
- In development
- Stage not stated
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Loads
- In development
- Stage not stated
- Size not stated
- Other infrastructure
Hollister 115 kV line: route and 5 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Hollister 115 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 115 kV
- States crossed
- US-CA
- Owner (as stated)
- Pacific Gas Electric
Details
Who’s behind it
- Owner
- Pacific Gas Electric
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 9
- Substations at the ends (as the source names them)
- Hollister
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | pacific gas electric |
| HIFLD line ID | 308561 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Crazy Horse Solar Project Postponed | Solar | 5.4 mi | 2 |
| Gilroy Data Center - Temp Crane Filed | Large load | 9.5 mi | |
| Renz Energy Storage Postponed | Storage | 9.6 mi | 20 |
| AWS DATA CENTER GILROY - SFO069 Unknown | Large load | 10.1 mi | |
| CA Moss Landing 3040 Hilltop Rd Postponed | Solar + storage | 11.8 mi | 2.2 |
Sources EIA-860M · FAA OE/AAA · EPA ICIS-NPDES