Show on map
Holtsville Coast Solar Project — Power plant · Solar · Coast Energy Holdings, LLCNY CDG 009 — Under construction · Solar · NY · 1 MW · 4.0 mi awayBrookhaven Facility — Postponed · Biomass · NY · 1 MW · 6.3 mi awayKCE NY 29, LLC — Announced · Storage · NY · 79 MW · 9.7 mi awayManorville II — Filed · Solar + storage · NY · 1.4 MW · 13.4 mi awayKCE NY 31, LLC — Announced · Storage · NY · 50 MW · 14.1 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Holtsville Coast Solar Project

Power plant · Solar

Key facts

Power plant · Solarran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Net generation, 2025
17 MWh
Grid
13 kV to Long Island Power Authority (NYIS)
Location
Suffolk County, New York
Operated by
Coast Energy Holdings, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
1 year since 2025
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
NPCC
Report year
2025
Grid voltage kv
13.20
Transmission owner
Long Island Power Authority
Balancing authority code
NYIS
Balancing authority name
New York Independent System Operator
Fuel burned (MMBtu), 202558
Capacity factor, 20250.002
Net generation (MWh), 202517
Balancing authority codeNYIS

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
NY CDG 009 Under construction Solar 4.0 mi 1
Brookhaven Facility Postponed Biomass 6.3 mi 1
KCE NY 29, LLC Announced Storage 9.7 mi 79
Manorville II Filed Solar + storage 13.4 mi 1.4
KCE NY 31, LLC Announced Storage 14.1 mi 50

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution