Honea Path — Power plant · Oil · Central Electric Power
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2003
Net generation, 2025
117 MWh
Grid
12 kV to Little River Electric Coop Inc (DUK)
Location
Abbeville County, South Carolina
Operated by
Central Electric PowerSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2025
117MWh
Fuel burned, 2025
1,116MMBtu
Capacity factor, 2025
0.5%
Heat rate, 2025
9,538Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
20251171,1160.5%9,538
2024878880.3%10,207
2023666840.3%10,364
2022676900.3%10,298
2021757740.3%10,320
202066000.0%—
201931,7100.0%—
2018496300.2%12,857
2017907890.4%8,767
20161561,4580.6%9,346
2015726740.3%9,361
2014989520.4%9,714
2013656890.3%10,600
201200——
2011222380.1%10,818
20103350.0%11,667
2009293190.1%11,000
2008394000.1%10,256
2007483890.2%8,101
2006636770.2%10,746
2005373880.1%10,485
2004373720.1%10,055
20033734,4131.5%11,834
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources