Show on map
- Wind & solar
- Storage
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
- Other infrastructure
Honor Rancho: location and 5 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Honor Rancho
Gas storage site · Depleted field
Key facts
Gas storage site · Depleted field Operating- Location
- Los Angeles County, California
- Operated by
- Southern California Gas CoSourceEIA US Energy Atlas — Natural Gas Underground Storage (fields; operator, working gas capacity, field type)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Depleted field source: “Depleted Field”
- Capacity (Mcf)
- 27,000,000
Capacity not stated
All 13 attributes from EIA US Energy Atlas — Natural Gas Underground Storage (fields; operator, working gas capacity, field type)
| Attribute | Value |
|---|---|
| Source period | 202012 |
| Region | Pacific Region |
| Reservoir | WAYSIDE 13 |
| EIA field code | 330773 |
| Field type | Depleted Field |
| Status, as the source states it | Active |
| Base gas (Mcf) | 20,996,949 |
| Operator, as the source states it | SOUTHERN CALIFORNIA GAS COMPANY |
| EIA reservoir code | 3 |
| Source release | 202012 |
| Maximum deliverability (Mcf/d) | 1,000,000 |
| Total field capacity (Mcf) | 47,996,949 |
| Working gas capacity (Mcf) | 27,000,000 |
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Six Flags Magic Mountain Under construction | Solar + storage | 1.4 mi | 12 |
| Homestead Energy Storage LLC Postponed | Storage | 3.4 mi | 14 |
| Van Norman Bypass Solar Project Postponed | Solar | 12.3 mi | 2 |
| Humidor Storage I Contracted | Storage | 14.3 mi | 300 |
| 20525 Nordhoff PV (North) Under construction | Solar | 14.5 mi | 1.9 |