Show on map
Hoover - Mead 230 kV — Transmission lineBoulder Flats Solar — Under construction · Solar · NV · 113 MW · 9.0 mi awayBoulder Solar III LLC — Announced · Solar + storage · NV · 256 MW · 9.5 mi awayJASMINE DEVELOPMENT, LLC — Built · Large load · NV · 10.9 mi awayRoccasecca BESS LLC — Under construction · Storage · NV · 126.6 MW · 12.0 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Hoover - Mead 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NV

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
9
Substations at the ends (as the source names them)
Hoover to Mead
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID308717
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Boulder Flats Solar Under construction Solar 9.0 mi 113
Boulder Solar III LLC Announced Solar + storage 9.5 mi 256
JASMINE DEVELOPMENT, LLC Built Large load 10.9 mi
Roccasecca BESS LLC Under construction Storage 12.0 mi 126.6

Sources EIA-860M · EPA ICIS-Air · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026
  • CAISOOpen license, with credit · retrieved Nov 15, 2026Source: California ISO

Attribution