Hopewell - Cogentrix 230 kV — Transmission linePeanut LLC — Filed · Large load · VA · 3.9 mi awayCHIRISA RICHMOND LLC — Built · Large load · VA · 5.4 mi away11751 MEADOWVILLE OWNER LLC C/O GFH CAPITAL LTD — Built · Large load · VA · 5.6 mi awayChesterfield — Filed · Gas, combustion turbine · VA · 1,000 MW · 8.4 mi awayPetersburg - VA 0224 (Murphy) — Under construction · Solar · VA · 2.6 MW · 9.0 mi awayChester Solar Technology Park, LLC — Filed · Solar · VA · 160 MW · 10.3 mi awayBridleton Solar — Filed · Solar · VA · 20 MW · 11.5 mi awayChickahominy Power LLC — Postponed · Gas, combined cycle · VA · 1,716.3 MW · 11.8 mi awayC4GT — Postponed · Gas, combined cycle · VA · 1,060 MW · 12.1 mi awayPointOne Richmond LLC — Filed · Large load · VA · 12.5 mi awayPROJECT TROPICAL PHASE 2 - DATA CENTER AND SUBSTAT — Under construction · Large load · VA · 12.9 mi awayIRON MOUNTAIN DATA CENTER — Under construction · Large load · VA · 13.1 mi awaySCOUT DEVELOPMENT LLC — Built · Large load · VA · 13.4 mi awayQTS RICHMOND DATA CENTER — Built · Large load · VA · 13.7 mi awayBank of America - Sandston — Built · Large load · VA · 13.9 mi awayIron Mountain Information Management LLC — Filed · Large load · VA · 14.2 mi awayQTS RIC5 Data Center — Filed · Large load · VA · 15.0 mi away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Hopewell - Cogentrix 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-VA
Owner (as stated)
Virginia Electric Power

Details

Who’s behind it

Owner
Virginia Electric Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
1
Substations at the ends (as the source names them)
Hopewell to Cogentrix
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itvirginia electric power
HIFLD line ID123717
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Peanut LLC Filed Large load 3.9 mi
CHIRISA RICHMOND LLC Built Large load 5.4 mi
11751 MEADOWVILLE OWNER LLC C/O GFH CAPITAL LTD Built Large load 5.6 mi
Chesterfield Filed Gas, combustion turbine 8.4 mi 1,000
Petersburg - VA 0224 (Murphy) Under construction Solar 9.0 mi 2.6
Chester Solar Technology Park, LLC Filed Solar 10.3 mi 160
Bridleton Solar Filed Solar 11.5 mi 20
Chickahominy Power LLC Postponed Gas, combined cycle 11.8 mi 1,716.3
C4GT Postponed Gas, combined cycle 12.1 mi 1,060
PointOne Richmond LLC Filed Large load 12.5 mi
PROJECT TROPICAL PHASE 2 - DATA CENTER AND SUBSTAT Under construction Large load 12.9 mi
IRON MOUNTAIN DATA CENTER Under construction Large load 13.1 mi
SCOUT DEVELOPMENT LLC Built Large load 13.4 mi
QTS RICHMOND DATA CENTER Built Large load 13.7 mi
Bank of America - Sandston Built Large load 13.9 mi
Iron Mountain Information Management LLC Filed Large load 14.2 mi
QTS RIC5 Data Center Filed Large load 15.0 mi

Sources Virginia DEQ · EPA ICIS-Air · EIA-860M · EPA ICIS-NPDES · FAA OE/AAA

Sources

  • Virginia DEQOpen license · retrieved Nov 4, 2026Source: Virginia Department of Environmental Quality
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026

Attribution