Show on map
Hopkins Energy LLC — Power plant · Solar · Hopkins Energy LLCPine Forest Solar I — Built · Solar + storage · TX · 501.5 MW · 9.0 mi awaySolemio LLC — Postponed · Solar · TX · 80 MW · 12.3 mi awayLupinus Storage 3 — Postponed · Storage · TX · 50.9 MW · 13.3 mi away
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

Hopkins Energy LLC

Power plant · Solar

Key facts

Power plant · Solarran 26% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
572,220 MWh
Grid
345 kV to Oncor Electric Delivery Company LLC (ERCO)
Location
Hopkins County, Texas
Operated by
Hopkins Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
2 years since 2024
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000805124
Location id
L100000804457
Eia plant ids
67424
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
345
Transmission owner
Oncor Electric Delivery Company LLC
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20251,952,414
Capacity factor, 20250.261
Net generation (MWh), 2025572,220
Balancing authority codeERCO

Solar arrays

Array area (acres)
1,144.2
AC capacity (MW)
250
DC capacity (MW)
331.2
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2024

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Pine Forest Solar I Built Solar + storage 9.0 mi 501.5
Solemio LLC Postponed Solar 12.3 mi 80
Lupinus Storage 3 Postponed Storage 13.3 mi 50.9

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution