Hosensack 230 kV line: route and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Hosensack 230 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-PA
- Owner (as stated)
- PPL Electric Utilities
Details
Who’s behind it
- Owner
- PPL Electric Utilities
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 10
- Substations at the ends (as the source names them)
- Hosensack
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | ppl electric utilities |
| HIFLD line ID | 148541 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| TIERPOINT TWO, LLC - TEKPARK FACILITY Built | Large load | 10.2 mi | |
| TIERPOINT PENNSYLVANIA TWO LLC Built | Large load | 12.5 mi | |
| PPL Glendon LFGTE Plant Postponed | Biomass | 13.3 mi | 1.6 |
Sources EPA ICIS-Air · EIA-860M