Howard Down: location and 1 exact-grade project within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Howard Down
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 11% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2012
- Net generation, 2025
- 67,305 MWh
- Grid
- 69 kV to City of Vineland - (NJ) (PJM)
- Location
- Cumberland County, New Jersey
- Operated by
- City of Vineland - (NJ)
Output
- Gas
- Coal
- Oil
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 14 years since 2012
- Unused energy
- 530 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 10,390 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 699,309 |
| Capacity factor, 2025 | 0.113 |
| Heat rate (Btu/kWh), 2025 | 10,390.1 |
| Net generation (MWh), 2025 | 67,305 |
| Balancing authority code | PJM |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 70.5 MW
- Generators retired
- 6
- Capacity still in service
- 68.2 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 5 | Petroleum Liquids | 4 MW | Retired | December 2008 |
| 6 | Petroleum Liquids | 5 MW | Retired | December 2008 |
| 7 | Petroleum Liquids | 7.5 MW | Retired | December 2008 |
| 8 | Petroleum Liquids | 12.5 MW | Retired | June 2009 |
| 9 | Petroleum Liquids | 16.5 MW | Retired | June 2010 |
| 10 | Petroleum Liquids | 25 MW | Retired | September 2012 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 69 kV
- Transmission or distribution system owner
- City of Vineland - (NJ)
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
Transmission lines within 25 km (10)
- Cumberland Nj - Churchtown 230 kV
- Lincoln Station - Sherman Station 138 kV
- Cumberland Nj - Sherman Station 138 kV
- Landis Station - Deepwater 138 kV
- Lincoln Station - Unioin Station 138 kV
- New Freedom 500 kV line
- Cumberland Nj - Dennis Station 230 kV
- Cumberland Nj - Unioin Station 138 kV
- Corson Station - Unioin Station 138 kV
- Orchard Station - New Freedom 500 kV
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| City of Vineland - (NJ) | Operator | EIA-860M | ||
| CITY OF VINELAND NEW JERSEY | Owner | 100.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- Stated Unit 10 scheduled to retire, 25 MW · EIA-860M
- In service · EIA-860M
- Stated Unit 9 scheduled to retire, 16.5 MW · EIA-860M
- Stated Unit 8 scheduled to retire, 12.5 MW · EIA-860M
- Stated Units 5, 6, 7 scheduled to retire, 16.5 MW · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| LINCOLN DATA CENTER Under construction | Large load | 7.0 km |