Howard Down — Power plant · Gas, combustion turbine · City of Vineland - (NJ)LINCOLN DATA CENTER — Large load · NJ · 7.0 km away
  • Combustion
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Howard Down

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 11% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2012
Net generation, 2025
67,305 MWh
Grid
69 kV to City of Vineland - (NJ) (PJM)
Location
Cumberland County, New Jersey

Output

Net generation MWh by year, 2001 to 2026
Fuel burned MMBtu by year, 2001 to 2026
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
14 years since 2012
Unused energy
530 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
10,390 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000603197
Subparts reported
D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000751
Fuel burned (MMBtu), 2025699,309
Capacity factor, 20250.113
Heat rate (Btu/kWh), 202510,390.1
Net generation (MWh), 202567,305
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
70.5 MW
Generators retired
6
Capacity still in service
68.2 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
5Petroleum Liquids4 MWRetiredDecember 2008
6Petroleum Liquids5 MWRetiredDecember 2008
7Petroleum Liquids7.5 MWRetiredDecember 2008
8Petroleum Liquids12.5 MWRetiredJune 2009
9Petroleum Liquids16.5 MWRetiredJune 2010
10Petroleum Liquids25 MWRetiredSeptember 2012

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
City of Vineland - (NJ)
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
City of Vineland - (NJ) Operator EIA-860M
CITY OF VINELAND NEW JERSEY Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Unit 10 scheduled to retire, 25 MW · EIA-860M
  • In service · EIA-860M
  • Stated Unit 9 scheduled to retire, 16.5 MW · EIA-860M
  • Stated Unit 8 scheduled to retire, 12.5 MW · EIA-860M
  • Stated Units 5, 6, 7 scheduled to retire, 16.5 MW · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
LINCOLN DATA CENTER Under construction Large load 7.0 km