Show on map
Hunterstown — Power plant · Gas, combustion turbine · Hunterstown Power, LLCGranite Hill Solar — Postponed · Solar · PA · 70 MW · 1.7 mi away
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Hunterstown

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 5% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1971
Net generation, 2025
24,504 MWh
Grid
115 kV to Metropolitan Edison Co (PJM)
Location
Adams County, Pennsylvania
Operated by
Hunterstown Power, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
55 years since 1971
Unused energy
501 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
14,854 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
115
Transmission owner
Metropolitan Edison Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 2025363,984
Capacity factor, 20250.047
Heat rate (Btu/kWh), 202514,854.1
Net generation (MWh), 202524,504
Balancing authority codePJM

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Granite Hill Solar Postponed Solar 1.7 mi 70

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution